Product ID: CABLMANAGER2
The CABLMANAGER2 1U Cable Management Panel mounts to a standard 19” 2 or 4-post rack to help you organize network, server or KVM cabling, using D-Ring hooks. This TAA compliant product adheres to the requirements of the US Federal Trade Agreements Act (TAA), allowing government GSA Schedule purchases.
Constructed of high-quality steel, the cable organizer panel offers 5 removable ABS plastic D-Ring hooks, spaced 4in (105mm) apart for routing cables through your server rack and reducing cable strain. As an added benefit, the hook on either end of the panel can be turned 90° to accommodate horizontal or vertical rack cabling as needed.
Adding a cable manager in between equipment also functions to close off open spaces in the rack, promoting proper airflow.
Backed by a StarTech.com 2-year warranty.
Warranty Information | Warranty | 2 Years |
---|---|---|
Hardware | Orientation | Horizontal |
U Height | 1U | |
Frame Type | Steel | |
Mounting Options | Front Mount (Front Only) | |
Packaging Information | Package Height | 37 mm [1,5 in] |
Package Length | 50 cm [19,7 in] | |
Shipping (Package) Weight | 444,1 g [15,7 oz] | |
Package Width | 52 mm [2,0 in] | |
Physical Characteristics | Weight of Product | 378,1 g [13,3 oz] |
Material | Steel | |
Product Length | 88,6 mm [3,5 in] | |
Product Width | 48,3 cm [19,0 in] | |
Product Height | 43,5 mm [1,7 in] | |
What's in the Box | 1 - Included in Package | 1U Metal Cable Manager for 19" Rack |
Instruction Sheet |
We are always ready to assist you with any questions you may have.
Live Chat (opens in new window)We are always ready to assist you with any questions you may have.
Live Chat (opens in new window)When you install your rack equipment, it’s important to put the heaviest equipment on the bottom of the rack, first. This provides a strong base and is especially important if you are installing a lot of equipment on a tall rack. This also prevents the server rack from becoming top heavy and falling over.
If your equipment is long, heavy, unbalanced or otherwise difficult to handle, ask someone to help you install the equipment so you don’t injure yourself or damage the equipment.
Finally, when you tighten down your screws make sure you don’t strip or damage the screws. This is especially important to be aware of when using electric tools which can generate more torque.
The patch panel will be mounted using cage nuts, so the first step is to install them.
Once installed, the cage nuts can be used to mount our patch panel.
To install your server rack equipment, fasten the mounting screws into the cage nuts. After you tighten your screws, check to make sure your rack equipment is securely installed.
If you have questions about installing equipment into a server rack, contact our technical support team for further assistance.
Check out our review guidelines.